{"id":107,"date":"2021-09-09T17:58:20","date_gmt":"2021-09-09T08:58:20","guid":{"rendered":"https:\/\/ugitec.co.jp\/?post_type=products&#038;p=107"},"modified":"2022-01-28T17:08:47","modified_gmt":"2022-01-28T08:08:47","slug":"hardrock-boulder","status":"publish","type":"products","link":"https:\/\/ugitec.co.jp\/en\/products\/hardrock-boulder\/","title":{"rendered":"Hardrock and Boulder TBM"},"content":{"rendered":"\n<p>Cutter heads can be chosen from three types, flat type, semi-dome type and dome type depending on ground conditions and boulder or rock configulation.<\/p>\n\n\n\n<p>Disc cutters can be chosen from two types, chip insert type and quenched type depending on ground conditions.<\/p>\n\n\n\n<p>We have a delivery record of manufacturing with a maximum diameter of 10.82 m TBM.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u23008.78m  The Dover Channel Undersea Railroad Tunnel T2 <\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"688\" src=\"https:\/\/ugitec.co.jp\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-1024x688.jpg\" alt=\"\u23008.78m Hard Rock TBM\" class=\"wp-image-109\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-1024x688.jpg 1024w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-300x202.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-768x516.jpg 768w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-150x101.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-440x296.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-250x168.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-120x81.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-182x122.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-560x377.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-298x200.jpg 298w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01-1000x672.jpg 1000w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_01.jpg 1288w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1988, 1989 \/ France<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">The Dover Channel Undersea Railroad Tunnel T2<br>The Dover Channel Undersea Railroad Tunnel T3<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">EURO TUNNEL<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">TML<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">20,010m<br>18,858m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Vacuum erector<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">\u23002.97m Koishiwara Dam Headrace Facility Construction<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/ugitec.co.jp\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-1024x768.jpg\" alt=\"\u23002.99m Hard Rock TBM\" class=\"wp-image-110\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-1024x768.jpg 1024w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-300x225.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-768x576.jpg 768w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-1536x1152.jpg 1536w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-2048x1536.jpg 2048w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-150x113.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-440x330.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-250x188.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-120x90.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-182x137.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-560x420.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-298x224.jpg 298w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_02-1000x750.jpg 1000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2017 \/ Fukuoka Prefecture<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Koishiwara Dam Headrace Facility Construction<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Japan Water Agency<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Taisei Corporation<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">10,795m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Design water pressure 2.0Mpa, oil backup system<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">\u23006.88m East-West Transmission Cable Tunnel Contract EW1<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" src=\"https:\/\/ugitec.co.jp\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-1024x683.jpg\" alt=\"\u23006.88m Hard Rock TBM\" class=\"wp-image-111\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-1024x683.jpg 1024w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-300x200.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-768x512.jpg 768w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-1536x1024.jpg 1536w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-2048x1365.jpg 2048w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-150x100.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-440x293.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-250x167.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-120x80.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-182x121.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-560x373.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-298x199.jpg 298w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_03-1000x667.jpg 1000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2014 \/ Singapore<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">East-West Transmission Cable Tunnel Contract EW1<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">SP PowerAssets Limited<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Obayashi Corporation<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">3,018m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Delivered full back-up system<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">\u230010.82m Fushimi Tunnel Construction<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"875\" src=\"https:\/\/ugitec.co.jp\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-1024x875.jpg\" alt=\"\u230010.82m Hard Rock TBM\" class=\"wp-image-108\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-1024x875.jpg 1024w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-300x256.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-768x656.jpg 768w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-150x128.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-386x330.jpg 386w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-220x188.jpg 220w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-105x90.jpg 105w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-182x156.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-560x479.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-298x255.jpg 298w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04-1000x855.jpg 1000w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_bedrock_04.jpg 1129w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2004 \/ Kyoto Prefecture<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Fushimi Tunnel Construction<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Hanshin Expressway Public Corporation<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Obayashi \/ Sato Kogyo \/ Seibu Construction JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1,704m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Slurry TBM for large-diameter hard rocks and boulders<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"featured_media":109,"template":"","format":"standard","_links":{"self":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/products\/107"}],"collection":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/products"}],"about":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/types\/products"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/media\/109"}],"wp:attachment":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/media?parent=107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}