{"id":131,"date":"2021-09-06T10:57:10","date_gmt":"2021-09-06T01:57:10","guid":{"rendered":"https:\/\/ugitec.co.jp\/?post_type=products&#038;p=131"},"modified":"2023-11-07T14:48:32","modified_gmt":"2023-11-07T05:48:32","slug":"special","status":"publish","type":"products","link":"https:\/\/ugitec.co.jp\/en\/products\/special\/","title":{"rendered":"Special TBM"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">H&amp;V(Horizontal &amp; Vertical) TBM<\/h3>\n\n\n\n<p>H&amp;V means Horizontal variation &amp; Vertical variation.<br>The feature of H&amp;V TBM are; \u2460independently controlled circular TBMs that are connected each other with flexible joint.\u3000\u2461Each TBM can be disconnected in the ground as needed.\u3000\u2462Cross articulation system allows spiral advancing movement and as a result, the position of each TBM can change from a top and bottom line to right and left line.<\/p>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-I9XuA\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_01.jpg\" alt=\"H&amp;V(Horizontal &amp; Vertical) TBM\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1998 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Minamidai Pipe Line<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tokyo Metropolitan Government Bureau of Sewerage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Nishimatsu \/ Takenaka Civil Engineering \/ JDC JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">3.29m \/ 2.89m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">736m \/ 929m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Diverge during excavation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-1g0LsC\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_02-scaled.jpg\" alt=\"\u23005.85m\/11.79m H&amp;V(Horizontal &amp; Vertical) TBM\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2015 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tachiai River Drainage Channel<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tokyo Metropolitan Government Bureau of Sewerage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Shimizu Corporation<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">5.85m \/ 11.79m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">774m \/ 777m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Spiral excavation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n<\/div>\n<\/div><\/div>\n\n\n<div class=\"wp-block-file\"><object class=\"wp-block-file__embed\" data=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/TechnoBox_HV.pdf\" type=\"application\/pdf\" style=\"width:100%;height:715px\" aria-label=\"TechnoBox_H&amp;V\u306e\u57cb\u3081\u8fbc\u307f\u3002\"><\/object><a id=\"wp-block-file--media-b69b8fa8-8aad-4d23-9739-53b77e156853\" href=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/TechnoBox_HV.pdf\">TechnoBox_H&amp;V<\/a><a href=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/TechnoBox_HV.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-b69b8fa8-8aad-4d23-9739-53b77e156853\">Download<\/a><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">T-BOSS method (T-type basement Branch Off Shield System)<\/h3>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-ZM8SN\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-scaled.jpg\" alt=\"\u23004.19m T-BOSS method\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<p>It is one of the methods to connect the excavating tunnel to an existing tunnel. It has a built-in steel cylinder driven by cutter head driving power.<br>The steel cylinder has special cutter bits and bore through the existing tunnel wall, either steel segments or reinforced concrete segments. While advancing forward, the tunnel wall of TBM stays close to the exisiting tunnel.<br>The steel cylinder can resist ground pressure and water pressure, so that ground improvement work can be reduced and tunnel connection work can be done more safely and effectively.<\/p>\n\n<\/div>\n<\/div><\/div>\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-3 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"757\" height=\"357\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2.jpg\" alt=\"assembly drawing of T-BOSS\" class=\"wp-image-425\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2.jpg 757w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-300x141.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-150x71.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-440x208.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-250x118.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-120x57.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-182x86.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-560x264.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_03-2-298x141.jpg 298w\" sizes=\"(max-width: 757px) 100vw, 757px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"577\" height=\"331\" src=\"https:\/\/ugitec.co.jp\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3.jpg\" alt=\"T-BOSS 3D\" class=\"wp-image-227\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3.jpg 577w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-300x172.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-150x86.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-440x252.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-250x143.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-120x69.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-182x104.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-560x321.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_03-3-298x171.jpg 298w\" sizes=\"(max-width: 577px) 100vw, 577px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2022 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Higashi Ojima Pipe Line<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tokyo Metropolitan Government Bureau of Sewerage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Kumagai Gumi Co., Ltd.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">4.19m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1880m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong> <\/td><td class=\"has-text-align-left\" data-align=\"left\">It makes unnecessary for site workers to work on the cutting face and thus improves safety and construction efficiency.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Inner Shell DSR TBM (Draw a Shield for Recycle system)<\/h3>\n\n\n\n<p>The TBM&#8217;s external casing and internal unit are constructed as independent units, and the internal (drive) unit is removed following completion of tunneling of the first section. It is taken to the departure shaft, where a new external casing is fitted, and excavation is then begun on the next construction section. Because the TBM&#8217;s internal unit is resued, there is no need to construct an arrival shaft. The drive shaft can also be set up anywhere along the construction route.<\/p>\n\n\n<div class=\"wp-block-lazyblock-img-column lazyblock-img-column-14u0E\"><div class=\"c-Grid -col-2\">\n<div class=\"c-Grid_Row\">\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_04.jpg\" alt=\"\u23002.68m Inner Shell DSR TBM\" loading=\"lazy\">\n<\/div>\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_04-2.jpg\" alt=\"Inner Shell DSR TBM\" loading=\"lazy\">\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2001 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Reconstruction work near Honkomagome 1, 3-chome, Bunkyo-ku<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tokyo Metropolitan Government Bureau of Sewerage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Arai \/ Shiraishi JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2.68m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">686m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Mother and Child TBM<\/h3>\n\n\n\n<p>It has a built-in Child unit TBM that can be separated in the underground. As a result, the Mother unit TBM and Child unit TBM can excavate tunnels of different size. Various methods can be applied to the cutter head separation technology, depending on the conditions such as the type, size, and diameter difference of cutter head between the Mother unit and Child unit.<\/p>\n\n\n<div class=\"wp-block-lazyblock-img-column lazyblock-img-column-Z1ssI5H\"><div class=\"c-Grid -col-3\">\n<div class=\"c-Grid_Row\">\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_05.jpg\" alt=\"\u23008.17m\/6.78m Mother and Child TBM\" loading=\"lazy\">\n<\/div>\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_05-2.jpg\" alt=\"Mother and Child TBM1\" loading=\"lazy\">\n<\/div>\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_05-3.jpg\" alt=\"Mother and Child TBM2\" loading=\"lazy\">\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2005 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Line 13 South Ikebukuro Line A Construction<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tokyo Metro Co., Ltd.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Obayashi \/ Toa \/ Dai Nippon JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">8.17m \/ 6.78m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong> <\/td><td class=\"has-text-align-left\" data-align=\"left\">132m \/ 1,454m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Eccentric multi-axis TBM (DPLEX TBM)<\/h3>\n\n\n\n<p>It is a method of excavation by driving multiple parallel links that support the cutter head.&nbsp;By changing the cutter head to a shape other than a circle, various cross-section excavations are possible.<\/p>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-1lPymY\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_07.jpg\" alt=\"\u23007.67m Eccentric multi-axis TBM (DPLEX TBM)\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1999 \/ Hyogo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Kanaoka Stormwater Storage Pipe Line<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Itami City<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Shimizu \/ Kumagai \/ Maeda JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">7.67m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong> <\/td><td class=\"has-text-align-left\" data-align=\"left\">1,150m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n<\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-ZxKcP\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_06.jpg\" alt=\"\u23003.93\uff4d \/ 2.14\uff4d Eccentric multi-axis TBM (DPLEX TBM)\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2002 \/ Osaka<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Doigawa Stormwater Line Sewage Pipe Line (No. 2)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Sakai City Construction Bureau Sewerage Department<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Obayashi \/ Daiho \/ Sakai Doken JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">3.93\uff4d \/ 2.14\uff4d<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1,777m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong> <\/td><td class=\"has-text-align-left\" data-align=\"left\">Mother and Child TBM, DPLEX TBM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n<\/div>\n<\/div><\/div>\n\n\n<h3 class=\"wp-block-heading\">Multi-Face TBM (MF TBM)<\/h3>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-BfWpd\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_08.jpg\" alt=\"\u23007.44m\/16.44m Multi-Face TBM (MF TBM)\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<p>The MF TBM has multiple cutter heads overlapping each other, and excavate several kinds of sections, wind or tall oblong cross sections. It can be used effectively in limited areas or spaces in underground structures. It can supply effective tunnel sections to meet construction conditions and tunnel purposes.<\/p>\n\n<\/div>\n<\/div><\/div>\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2000 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Kiyosumi Construction Area on Subway Line 11<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Teito Rapid Transit Authority<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Kumagai \/ Maeda \/ Mitsui JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">7.44m \/ 16.44m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong><strong>Excavation distance<\/strong><\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">373m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">MSD TBM (Mechanical Shield Docking TBM)<\/h3>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-Z1ND1p5\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_09-scaled.jpg\" alt=\"\u23002.59\uff4d MSD TBM (Mechanical Shield Docking TBM)\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<p>Two TBMs coming from opposite directions meet each other under the ground. One TBM has a steel cylinder pushing forward to the other machine. Another TBM has rubber ring jointing with the cylinder. The steel cylinder and rubber ring can shut off soil and ground water completely. After docking, the equipment and structure inside the two machines are removed, then tunnels are jointed.<\/p>\n\n<\/div>\n<\/div><\/div>\n\n\n<h4 class=\"wp-block-heading\">Jointing method<\/h4>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"206\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-1024x206.jpg\" alt=\"drawing of Jointing method\" class=\"wp-image-427\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-1024x206.jpg 1024w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-300x60.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-768x154.jpg 768w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-150x30.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-440x88.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-250x50.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-120x24.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-182x37.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-560x112.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-298x60.jpg 298w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2-1000x201.jpg 1000w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-2.jpg 1136w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n<h4 class=\"wp-block-heading\">Joint details<\/h4>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"153\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-1024x153.jpg\" alt=\"drawing of Joint details\" class=\"wp-image-429\" srcset=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-1024x153.jpg 1024w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-300x45.jpg 300w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-768x115.jpg 768w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-150x22.jpg 150w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-440x66.jpg 440w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-250x37.jpg 250w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-120x18.jpg 120w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-182x27.jpg 182w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-560x84.jpg 560w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-298x44.jpg 298w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3-1000x149.jpg 1000w, https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_en_09-3.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2010 \/ Tokyo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Water pipe (1500 mm) between 2781 Aiharamachi and 706 Aiharamachi, Machida City<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tokyo Metropolitan Government Bureau of Waterworks<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Shimizu \/ Fudo Tetra Construction JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2.59\uff4d<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1,538m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Features<\/strong> <\/td><td class=\"has-text-align-left\" data-align=\"left\">It is an economical method that does not require an auxiliary construction method to strengthen the shaft or ground.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">TBM for steep inclines<\/h3>\n\n\n\n<p>It is a TBM dedicated to steep slopes that excavates tunnels with a slope of more than 30% diagonally upward.&nbsp;In order to excavate steep slopes, a large gripper and anti-slip steel or invert block are supported by shield jacks to prevent the machine from slipping.&nbsp;3 of 4 past constructions in Japan are manufactured by us.<\/p>\n\n\n<div class=\"wp-block-lazyblock-img-column lazyblock-img-column-1UQLOh\"><div class=\"c-Grid -col-2\">\n<div class=\"c-Grid_Row\">\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_10.jpg\" alt=\"\u23002.7m TBM for steep inclines\" loading=\"lazy\">\n<\/div>\n<div class=\"c-Grid_Item\">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_10-2.jpg\" alt=\"\" loading=\"lazy\">\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2002 \/ Miyazaki Prefecture<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Komarugawa Power Plant Hydraulic Pipeline Inclined Shaft<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Kyushu Electric Power Co., Inc.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Okumura \/ Sato \/ Daiho \/ Asanuma JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2.7m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">1,780m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Vertical TBM<\/h3>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-NAsR8\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_11-scaled.jpg\" alt=\"\u23004.76m Vertical TBM\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<p>It is a TBM that vertically excavates the ground including rocks of deep underground.&nbsp;<br>In addition to various seals that support high water pressure, the soil discharge system is divided into two line to reduce water pressure during excavation, achieving stable excavation.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2006 \/ Okayama Prefecture<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Kurashiki Base Propane Storage Tank I Construction (Water Supply \/ Ventilation Shaft)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Japan Oil, Gas and Metals National Corporation (JOGMEC)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Shimizu \/ Hazama \/ Okumura JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>TBM outer diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">4.76m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Excavation distance<\/strong> <\/td><td class=\"has-text-align-left\" data-align=\"left\">146m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div>\n<\/div><\/div>\n\n\n<h3 class=\"wp-block-heading\">Automatic underwater excavation machine<\/h3>\n\n\n\n<p>The automatic underwater excavation machine has a built-in excavation pattern that automatically excavates the base plate directly on the cutting edge so that the caisson can be smoothly submerged in a wide range of ground conditions.<\/p>\n\n\n<div class=\"wp-block-lazyblock-img-inner lazyblock-img-inner-Z1ic3LN\"><div class=\"c-Align\">\n<figure class=\"c-Align_Media -l \">\n<img decoding=\"async\" src=\"https:\/\/ugitec.co.jp\/en\/wp\/wp-content\/uploads\/2021\/09\/products_special_12.jpg\" alt=\"\u81ea\u52d5\u6c34\u4e2d\u6398\u524a\u6a5f\" loading=\"lazy\">\n<\/figure>\n<div class=\"c-Align_Body\">\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Year of delivery \/ Place of delivery<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">2021 \/ Osaka<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Construction name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Neyagawa Northern Underground River Jyohoku Shaft<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Owner name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Osaka Prefecture<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Contractor name<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Toda \/ Hanshin \/ Daiyo JV<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Caisson inner diameter<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">28m<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Caisson depth<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">102m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div>\n<\/div><\/div>","protected":false},"featured_media":133,"template":"","format":"standard","_links":{"self":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/products\/131"}],"collection":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/products"}],"about":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/types\/products"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/media\/133"}],"wp:attachment":[{"href":"https:\/\/ugitec.co.jp\/en\/wp-json\/wp\/v2\/media?parent=131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}