Technology
Hardrock, Boulder
Front crusher
The crusher can crush boulders at the front of bulkhead. As a result, It can reduce the downtime of the site operation by preventing the boulder blockage in the slurry discharge pipe, and larger cutter openings give effective material flow and cutter wear reduction.

