Reduction of Site Work

Installation of power unit onto the deck

Installation of power unit onto the deck

By installing the power units onto the working deck inside the machine instead of back-up cars, the number of initial driving tempolary hoses and cables can be reduced, and therefore the setup change work of initial driving can be shortened.

Full back-up equipment

We can deliver the full back-up equipment such as slurry transportation system and slurry treatment plant required for excavation of slurry type TBM.